Excavate the trench
level off approx. 5cm of compacted gravel with cable sand
lay a 230V supply cable with a Schuko plug ready in the pit
conduit to the entry point (without cable)
Patent and innovation turnkey Gate systems
The gate system (sliding gate, swing gate, pedestrian door, mailbox column, etc.) is professionally mounted onto a gate foundation at the factory. On site, everything then goes very quickly! Ill-fitting foundations, misplaced cable outlets, insufficient anchoring in the concrete and gate installation in bad weather are all a thing of the past.
Delivery & Commissioning
Delivery, positioning and commissioning of a Hybrid Cube gate system all take place within a single day and require very little on-site preparation.
Simply place the gate system in the pit using a truck crane.
Ill-fitting foundations, misplaced cable outlets, insufficient anchoring in the concrete and gate installation in bad weather are all a thing of the past.
Feed the 230V cable into the column
run the connecting cable to the entry point
plug in
Our unrivalled service package provides the foundation, as well as the Installation along too!
Maximum cost and process security. Reliably calculable.